www.fuzzyworld3.com  >  Model Railroad  >  Husher Central  >  a125   What's New  •  N/U Pictures   

20150213_210720

 < < Previous Album Index Next > > 
20150213_210720.jpg

Progress has been made on Graham's module.  At left, the transload track needs "N Scale" roadbed, with a ramp down from the "HO Scale" cork.  The next track to the right is the Old Run-Around, which is now the main line.  In the background, the first piece of track has been laid, a reused and reconditioned Atlas #6 turnout.  The next piece of roadbed ("N Scale" cork) is the Old Main, which was removed after a derailment (so the story goes), the far end still needs to be finished once the Passing Track gets roadbed.  To the right, the Passing Track needs "HO Scale" cork, as well as the Warehouse Spur.  Mark W. Hintz photo, 02/13/15

Back to Album Index
http://www.fuzzyworld3.com/modelrr/hc/a125.html ©02/14/2015 Mark W. Hintz
   www.fuzzyworld3.com  >  Model Railroad  >  Husher Central  >  a125   Contact Us