Been meaning to post this for a while, but there are now two construction zones on WIS-36:
- From the north side of Burlington to WIS-20(/83), with a short break at the Bypass interchange. This zone has CTH-W closed to thru traffic, and limited turns at other intersections.
- From WIS-100(/US-45) to ??? (Edgerton, at least -- I'm usually off 36 at Rawson!)
Both areas seem to be of a similar nature (maybe even two seections of the same project?): new culverts, intersection changes ("separated" left turn lanes), and mill-and-repave.
The north section has had several reconfigurations of temporary traffic lanes, since idjit drivers don't pay attention to signs or lane markings...